In this section

Building Code Requirements in New South Wales

Which edition of the National Construction Code applies in New South Wales, its adoption timeline, and the state-specific variations that affect what you build.

In New South Wales, houses, sheds and decks (Class 1 and Class 10) are still built to NCC 2022. NSW has put NCC 2025 back. It’s now set to start from 1 May 2027. So every job you’re quoting or setting out today runs to NCC 2022. There’s no choice of edition on site — you work from one rule book.

Use that to get the basics right. Our NCC-for-chippies stairs pillar covers the riser, going and rail numbers that decide a pass or fail, and the concrete calculations guide helps you order the right amount for slabs, footings and pads.

Adoption status

Announced
Current code in force
NCC 2022
Next edition
NCC 2025 (from 1 May 2027)
Adoption / transition
NSW deferred NCC 2025 to 1 May 2027 — build to NCC 2022 until then.
Official source →

Last verified 2026-07-27

State variations

  • NCC energy (Vol 2 Pt 13 / Sec J)

    BASIX applies in place of NatHERS-only pathway for residential energy

    Source → Related: au-hub Verified 2026-07-22

Content adapted from the National Construction Code 2022, provided by the Australian Building Codes Board under the CC BY 4.0 licence.