The requirement
France has no one footing depth for every site. But public rules do give minimum depths for a defined clay-risk construction route. It is wrong to say that every depth figure is hidden in a paid standard.
The ministry’s guidance for the prescribed route gives at least 1.20 m in high-exposure clay zones and 0.80 m in medium-exposure zones. It also describes the alternative of following a suitable design ground study. These numbers are not a general frost-depth table for all of France.
Confirm the mapped zone, work type, legal scope and chosen route. The design must cover the ground, loads, nearby trees and water. Depth alone does not settle width, reinforcement or the rest of the foundation detail.
NF DTU 13.1 and the French Eurocode standards may form part of the project specification. Their full licensed text was not reviewed here. Do not infer an exact frost zone, cover or concrete grade from this summary.
Work out the concrete volume
Use the concrete sizes on the approved plan. Embedment is the depth from ground level to the base of the footing. It is not the thickness of concrete to pour. A strip, wall and trench fill each have their own shape. Work out each part on its own. Where parts meet, count that concrete once.
This example uses a straight concrete strip with the same size all along:
- Total concrete length: 26 m.
- Concrete width: 0.45 m.
- Concrete thickness, measured from its top to its underside: 0.60 m.
These are example sizes, not code limits or a footing design. Check the shape and size on the plans. Then check how deep the base must sit. It must meet the soil and frost rules for the site.
Volume = length × concrete width × concrete thickness.
26 × 0.45 × 0.60 = 7.02 m³.
That is the volume before any extra for waste or uneven ground. Measure the trench or forms. Agree the extra amount and final order with the supplier. The tool does the sum. It does not choose safe footing sizes.
Do it in 5 seconds
Related
- Part of the French building-codes hub — how the CCH and the NF DTU standards fit together.
- Setting out the stairs above these footings? See French stair & guard-rail rules.
Sources
- French ministry: clay shrinkage and construction duties.
- Official practical guide: building on clay soils.
Public source scope checked on 6 September 2026. The licensed standards, site study and full project design still need review.
Related building rules
More France rules
Footings in other countries
- Footing Sizes & Site Classification (AS 2870)
- US Footing Sizes & Frost Depth (IRC R403)
- NZ House Foundations & 'Good Ground' (NZS 3604)
- UK Foundation Depths & Footing Widths (Doc A)
- Canada Footing Sizes (NBC 9.15)
- Irish Strip Foundations: Widths, Depth & Concrete (TGD A)
- Does Germany Have a Fixed Foundation Depth?
- Spanish Footings: Ground Study, Design and Concrete Volume
- Indonesian Foundations: No Frost Rule, Design-Driven Depth
- Japanese Foundation Rules: Depth, Concrete & Rebar Cover
- Indian Foundation Rules: Depth, Thickness & Concrete Grade (NBC 2016)
- Norwegian Foundation Depth & Width: Why TEK17 Sets No Fixed Number
- Swedish Foundation Depth & Width: Why Boverket Sets No Fixed Number