# Building Code Requirements in Maharashtra

Maharashtra's UDCPR sets its own habitable-room height cap, a broader stair-width relaxation, and a fixed handrail height — three genuine deltas from NBC 2016's national figures.

- Canonical HTML: https://www.chippy.tools/building-codes/in/mh/
- Publisher: Chippy Tools
- Language: en
- Updated: 2026-09-21

[Browse all topics](https://www.chippy.tools/building-codes/topics/)[Free web tools](https://www.chippy.tools/building-codes/tools/)[Printable references](https://www.chippy.tools/building-codes/printables/)

[All countries](https://www.chippy.tools/building-codes/) [India](https://www.chippy.tools/building-codes/in/)

Topics

Stairs

- [Indian Stair Rules: Riser, Going, Width & Headroom (NBC 2016)](https://www.chippy.tools/building-codes/in/stairs/stair-and-barrier-requirements/)

Footings

- [Indian Foundation Rules: Depth, Thickness & Concrete Grade (NBC 2016)](https://www.chippy.tools/building-codes/in/footings/footing-sizes-and-depth/)

Room heights

- [Delhi Room and Stair Rules Under UBBL 2016](https://www.chippy.tools/building-codes/in/dl/ubbl-room-and-stair-rules/)
- [Maharashtra Room & Stair Sizes: The UDCPR 2020 Rules](https://www.chippy.tools/building-codes/in/mh/udcpr-room-and-stair-rules/)
- [Indian Room Height & Area Rules: The NBC 2016 Numbers](https://www.chippy.tools/building-codes/in/rooms/minimum-room-heights/)

Ramps

- [Indian Ramp Guidance: NBC 2016 Scope and Gradients](https://www.chippy.tools/building-codes/in/ramps/ramp-gradients/)

Wet areas

- [India Wet-Area Waterproofing: Check the Project Specification](https://www.chippy.tools/building-codes/in/wet-areas/waterproofing-requirements/)

By state

- [Delhi](https://www.chippy.tools/building-codes/in/dl/)
- [Maharashtra](https://www.chippy.tools/building-codes/in/mh/)

Calculation guides

- [Concrete Calculations: The Complete On-Site Guide](https://www.chippy.tools/building-codes/concrete/concrete-calculations-guide/)
- [How to Calculate Concrete Volume for a Slab](https://www.chippy.tools/building-codes/concrete/concrete-volume-slab/)
- [How Many Bags of Concrete Per m³? (20kg, 25kg, 40kg)](https://www.chippy.tools/building-codes/concrete/bags-of-concrete-per-m3/)
- [Concrete for Post Holes: Volume Per Hole & Bags Needed](https://www.chippy.tools/building-codes/concrete/concrete-post-holes/)
- [Concrete Mix Ratios Explained: 1:2:3, 1:2:4 & Water-Cement Ratio](https://www.chippy.tools/building-codes/concrete/concrete-mix-ratios/)
- [Roof Pitch to Angle: Convert Rise/Run to Degrees & Grade](https://www.chippy.tools/building-codes/concrete/roof-pitch-to-angle/)
- [Rafter Length Calculation: Run, Rise & Overhang](https://www.chippy.tools/building-codes/concrete/rafter-length/)
- [Stair Rise & Run Setout: Riser, Going & the 2R+G Formula](https://www.chippy.tools/building-codes/concrete/stair-rise-and-run-setout/)
- [How to Convert a Fall or Gradient: Ratio, Percentage & Degrees](https://www.chippy.tools/building-codes/concrete/fall-and-gradient-conversion/)
- [Stud & Joist Spacing Takeoff: How Many at 400, 450 & 600 mm Centres](https://www.chippy.tools/building-codes/concrete/stud-and-joist-spacing-takeoff/)
- [Gravel & Base Volume: Compacted Depth vs Loose-Fill Order Quantity](https://www.chippy.tools/building-codes/concrete/gravel-and-base-volume/)

In this section

[Browse all topics](https://www.chippy.tools/building-codes/topics/)[Free web tools](https://www.chippy.tools/building-codes/tools/)[Printable references](https://www.chippy.tools/building-codes/printables/)

[All countries](https://www.chippy.tools/building-codes/) [India](https://www.chippy.tools/building-codes/in/)

Topics

Stairs

- [Indian Stair Rules: Riser, Going, Width & Headroom (NBC 2016)](https://www.chippy.tools/building-codes/in/stairs/stair-and-barrier-requirements/)

Footings

- [Indian Foundation Rules: Depth, Thickness & Concrete Grade (NBC 2016)](https://www.chippy.tools/building-codes/in/footings/footing-sizes-and-depth/)

Room heights

- [Delhi Room and Stair Rules Under UBBL 2016](https://www.chippy.tools/building-codes/in/dl/ubbl-room-and-stair-rules/)
- [Maharashtra Room & Stair Sizes: The UDCPR 2020 Rules](https://www.chippy.tools/building-codes/in/mh/udcpr-room-and-stair-rules/)
- [Indian Room Height & Area Rules: The NBC 2016 Numbers](https://www.chippy.tools/building-codes/in/rooms/minimum-room-heights/)

Ramps

- [Indian Ramp Guidance: NBC 2016 Scope and Gradients](https://www.chippy.tools/building-codes/in/ramps/ramp-gradients/)

Wet areas

- [India Wet-Area Waterproofing: Check the Project Specification](https://www.chippy.tools/building-codes/in/wet-areas/waterproofing-requirements/)

By state

- [Delhi](https://www.chippy.tools/building-codes/in/dl/)
- [Maharashtra](https://www.chippy.tools/building-codes/in/mh/)

Calculation guides

- [Concrete Calculations: The Complete On-Site Guide](https://www.chippy.tools/building-codes/concrete/concrete-calculations-guide/)
- [How to Calculate Concrete Volume for a Slab](https://www.chippy.tools/building-codes/concrete/concrete-volume-slab/)
- [How Many Bags of Concrete Per m³? (20kg, 25kg, 40kg)](https://www.chippy.tools/building-codes/concrete/bags-of-concrete-per-m3/)
- [Concrete for Post Holes: Volume Per Hole & Bags Needed](https://www.chippy.tools/building-codes/concrete/concrete-post-holes/)
- [Concrete Mix Ratios Explained: 1:2:3, 1:2:4 & Water-Cement Ratio](https://www.chippy.tools/building-codes/concrete/concrete-mix-ratios/)
- [Roof Pitch to Angle: Convert Rise/Run to Degrees & Grade](https://www.chippy.tools/building-codes/concrete/roof-pitch-to-angle/)
- [Rafter Length Calculation: Run, Rise & Overhang](https://www.chippy.tools/building-codes/concrete/rafter-length/)
- [Stair Rise & Run Setout: Riser, Going & the 2R+G Formula](https://www.chippy.tools/building-codes/concrete/stair-rise-and-run-setout/)
- [How to Convert a Fall or Gradient: Ratio, Percentage & Degrees](https://www.chippy.tools/building-codes/concrete/fall-and-gradient-conversion/)
- [Stud & Joist Spacing Takeoff: How Many at 400, 450 & 600 mm Centres](https://www.chippy.tools/building-codes/concrete/stud-and-joist-spacing-takeoff/)
- [Gravel & Base Volume: Compacted Depth vs Loose-Fill Order Quantity](https://www.chippy.tools/building-codes/concrete/gravel-and-base-volume/)

[Building Codes](https://www.chippy.tools/building-codes/) [India](https://www.chippy.tools/building-codes/in/) Maharashtra

# Building Code Requirements in Maharashtra

Maharashtra's UDCPR sets its own habitable-room height cap, a broader stair-width relaxation, and a fixed handrail height — three genuine deltas from NBC 2016's national figures.

Maharashtra builds to its **Unified Development Control and Promotion Regulations (UDCPR), 2020** — the state’s own consolidated planning and building-bye-law document, sanctioned by the Urban Development Department and incorporating NBC 2016. UDCPR sets several of its own numbers where NBC leaves a gap or a single national figure.

**Room height gets a maximum, not just a minimum.** NBC 2016 sets a 2.75 m minimum habitable-room height and no maximum at all. UDCPR’s Table 9A (§9.2.2) adds a cap: **2.75 m minimum, 4.5 m maximum** for an ordinary habitable room, tightening to **2.75 m minimum, 4.2 m maximum** for EWS/LIG (economically weaker section / low-income group) housing.

**Stair width is relaxed further than NBC’s national exception.** NBC’s 0.75 m stair-width figure only applies to a narrow case — row housing of two storeys. UDCPR’s Table 9G (§9.28.8) extends the same **0.75 m** minimum to **all individual or plotted housing up to G+2 storeys**, a broader carve-out than the national default.

**Handrail height is actually fixed here.** NBC gives no handrail-height figure at all for an ordinary dwelling’s internal stair (see [Indian stair rules](https://www.chippy.tools/building-codes/in/stairs/stair-and-barrier-requirements/)). UDCPR fills that gap: **minimum 1.0 m** from the centre of the tread to the top of the handrail — §9.29.3(vi).

Get the basics right and check the current UDCPR text for anything not covered here — our [stair calculator](https://www.chippy.tools/building-codes/in/stairs/stair-and-barrier-requirements/) and [concrete calculations guide](https://www.chippy.tools/building-codes/concrete/concrete-calculations-guide/) handle the day-to-day maths either way.

## Related

- [**India’s building code hub**](https://www.chippy.tools/building-codes/in/) — how NBC 2016 and state bye-law adoption work together.
- [**Indian stair rules**](https://www.chippy.tools/building-codes/in/stairs/stair-and-barrier-requirements/) — the NBC 2016 national figures this page’s deltas sit against.
- [**Indian room height & area rules**](https://www.chippy.tools/building-codes/in/rooms/minimum-room-heights/) — the national 2.75 m minimum UDCPR’s cap builds on.

**Read this first.** UDCPR 2020 still names and incorporates **NBC 2016** specifically, so it remains the practical, enforced reference for Maharashtra today — even though BIS has **withdrawn** NBC 2016 nationally and replaced it with **SP 7:2026** (“National Building Construction Standards 2026”), gazette-notified in 2026 (reported 30 April 2026). That’s a change to the national standard only; it doesn’t take effect here until UDCPR itself is updated to reference it. Confirm which edition your current UDCPR/NBC reference actually adopts before you rely on any figure above.

## Adoption status

Adopted

Current code in force

NBC 2016 (via Maharashtra UDCPR 2020)

Next edition

Not announced

Adoption / transition

Maharashtra's Unified DCPR (UDCPR) 2020 incorporates NBC 2016 with its own numbers: habitable-room height capped at 2.75–4.5 m (NBC sets only a 2.75 m minimum), staircase width of 0.75 m for individual/plotted housing up to G+2 storeys, and a fixed 1.0 m handrail height where NBC gives none for a dwelling.

[Official source →](https://www.mmrda.maharashtra.gov.in/sites/default/files/2023-10/UDCPR_compressed_2.pdf)

Last verified 2026-07-29

## State variations

- IN MH UDCPR
  
  Maharashtra's UDCPR caps habitable-room height at 4.5 m (min 2.75 m), where NBC 2016 sets only a 2.75 m minimum with no maximum. UDCPR also sets a 0.75 m stair width for individual/plotted housing up to G+2 storeys, and fixes handrail height at 1.0 m — a figure NBC leaves unset for an ordinary dwelling stair.
  
  [Source →](https://www.mmrda.maharashtra.gov.in/sites/default/files/2023-10/UDCPR_compressed_2.pdf) Related: [Indian Room Height & Area Rules: The NBC 2016 Numbers](https://www.chippy.tools/building-codes/in/rooms/minimum-room-heights/), [Indian Stair Rules: Riser, Going, Width & Headroom (NBC 2016)](https://www.chippy.tools/building-codes/in/stairs/stair-and-barrier-requirements/) Verified 2026-07-29

## Guides for this jurisdiction

- [Maharashtra Room & Stair Sizes: The UDCPR 2020 Rules](https://www.chippy.tools/building-codes/in/mh/udcpr-room-and-stair-rules/)
  
  UDCPR 2020 sets a 2.75 m least room height in Maharashtra, or 2.4 m if the room is air-conditioned, caps it at 4.5 m, lets a house stair drop to 0.75 m wide up to G+2, and leaves room floor sizes to the owner.

This page is general information for tradespeople and is not compliance, engineering or legal advice. Requirements are subject to state and territory variations and adoption timing. Always confirm requirements with your building certifier and relevant state authority.





## Page directory

- [Maharashtra Room & Stair Sizes: The UDCPR 2020 Rules](https://www.chippy.tools/building-codes/in/mh/udcpr-room-and-stair-rules/index.md): UDCPR 2020 sets a 2.75 m least room height in Maharashtra, or 2.4 m if the room is air-conditioned, caps it at 4.5 m, lets a house stair drop to 0.75 m wide up to G+2, and leaves room floor sizes to the owner.