The requirement
In Japan, a strip footing (布基礎) must go at least 240 mm into the ground. The base slab must be at least 150 mm thick. The stem must stand at least 300 mm above ground and be at least 120 mm thick. Those figures come from MLIT Notification No. 1347/2000, §一・4, not from the Law itself.
Here is the rule chain. The Building Standard Law and its Enforcement Order cover foundations in Article 38. Art. 38 §1 only sets a duty. A foundation must pass the building’s loads and forces safely into the ground. It must also stay safe against settlement or deformation of the ground. §3 then hands the structural method, and the actual numbers, to an MLIT Notification (告示). Which one applies depends on the building and the ground. For an ordinary strip footing, that is Notification No. 1347/2000 (平成12年建設省告示第1347号), §一・4. It fixes these minimums:
| Dimension | Minimum | Clause |
|---|---|---|
| Embedment depth (根入れの深さ) | ≥ 240 mm | §一・4・一 |
| Base-slab thickness (底盤の厚さ) | ≥ 150 mm | §一・4・一 |
| Stem/upstand height above ground (立上り部分の高さ) | ≥ 300 mm | §一・3・三 (carried into §4) |
| Stem/upstand thickness (立上り部分の厚さ) | ≥ 120 mm | §一・3・三 (carried into §4) |
| Base-slab width (底盤の幅) | table-driven, roughly 180–600 mm by ground bearing capacity, building weight class and storey count | §一・4・二 |
Four of those rows are flat minimums. Base slab width is the odd one out. No single figure sets it. You read it off a table in the Notification. The table keys off your ground’s bearing capacity, the building’s weight class, and the storey count.
- 1 footing
- 2 ground
Frost depth is a local rule, not a national one. In cold regions such as Hokkaidō or Tōhoku, a footing must sit below the frost line. That depth comes from a prefectural or municipal ordinance. It sits outside the national Building Standard Law and Enforcement Order. Check your local government’s rules for the figure.
The concrete. Reinforced concrete needs a 4-week compressive strength of at least 12 N/mm² (12 MPa) with normal aggregate. With lightweight aggregate the floor is at least 9 N/mm². That is Enforcement Order Art. 74 §1, items 1–2. It covers RC footings, even under a timber house. It is only the legal floor. Your engineer sets the real design strength for the job, above that floor.
Rebar cover is tiered by member, not one number. Art. 79 §1 sets:
| Member | Min. cover |
|---|---|
| Non-bearing wall or floor | 20 mm |
| Bearing wall, column or beam | 30 mm |
| In direct soil contact, incl. a strip footing’s upstand/stem | 40 mm |
| Footing base itself (excl. upstand & blinding layer) | 60 mm |
Work it out on site
The 240 mm embedment is a legal floor, not a target. Your real depth still answers to the ground, its bearing capacity, and any local frost rule. The width comes off the Notification’s table. Once your engineer or building official confirms both, the concrete volume is simple maths. It feeds straight into the calculator. Say you have a strip footing to pour. These are example numbers, not the code minimums:
- Total length of trench: 30 m
- Footing width: 0.45 m. Example only. Yours comes off the Notification’s width table for your ground.
- Footing depth: 0.5 m. Example only. Never less than the 240 mm floor. In practice your ground, its bearing capacity, and any frost rule set it.
Volume is length times width times depth:
30 × 0.45 × 0.5 = 6.75 m³
So you would order about 6.75 cubic metres. Then add a bit for spillage and an uneven trench. Most builders tack on 5 to 10 per cent. Swap in your own numbers and the calculator does the sum.
Do it in 5 seconds
Related
- Part of the Japanese building-rules hub. One national Law, its Enforcement Order, and the calculators that solve it.
- Setting out the stairs on the same build? See Japanese stair rules.
Sources
- Building Standard Law Enforcement Order (建築基準法施行令), Art. 38 (foundation general duty and delegation to MLIT Notification), Art. 74 §1 (concrete strength), Art. 79 §1 (rebar cover, tiered by member). Read the current consolidated text at laws.e-gov.go.jp.
- MLIT Notification No. 1347/2000 (建設省告示第千三百四十七号, 平成12年5月23日; 建築物の基礎の構造方法及び構造計算の基準を定める件), §一・3–4 — strip-footing embedment, base-slab thickness, stem height and thickness, and the base-slab-width table, issued under Enforcement Order Art. 38 §3. Read MLIT’s own hosted copy at mlit.go.jp.
Read this first. Japan’s Building Standard Law and Enforcement Order are a single, continuously-amended text, checked here as of 29 July 2026 at the official e-Gov law database. Foundation depth, stem height/thickness and base-slab thickness are fixed not by the Law or Order themselves, but by the MLIT Notification they delegate to — MLIT Notification No. 1347/2000, read directly against its own primary text for this page. Base-slab width stays genuinely table-driven, not a single mm figure. Frost depth is set locally by prefectural or municipal ordinance, not nationally. Always confirm the current text at laws.e-gov.go.jp or mlit.go.jp, and get your ground properly assessed by a structural engineer, before you dig.