The requirement
Before you pour a strip foundation in England, two numbers matter most: how deep the trench goes, and how wide the footing is. Both live in Approved Document A (Structure), Section 2E “Foundations of plain concrete”. This is the guide that shows one way to meet Requirement A1 of the Building Regulations for a normal house.
Depth — the 450 mm floor. Except where you’re building straight onto rock, the underside of the strip foundation should be at least 0.45 m (450 mm) deep. That keeps it below where frost can get at the ground and heave it. The guide is clear that this depth will commonly need to go deeper in areas that get long spells of frost (para 2E4). So treat 450 mm as the minimum, not the plan.
- 1 footing
- 2 reinforcement
- 3 ground
Deeper on shrinkable clay. Clay that swells when wet and shrinks when dry moves the most, so it needs a deeper dig. Where the clay has a Modified Plasticity Index of 10% or more, the underside should be at least:
| Clay shrinkage | Minimum depth to underside |
|---|---|
| Low | 0.75 m |
| Medium | 0.9 m |
| High | 1.0 m |
And it may need to go deeper still near trees or hedges, whose roots dry the clay out. Which clay you’ve got — and how the trees affect it — comes from a soils report or an engineer, not a look in the trench.
Width — read it off Table 10. The footing width depends on the ground type and the total load on the wall (in kN per metre run). Table 10 gives the recommended minimum widths. Here’s the shape of it:
| Ground type | Width at ≤ 20 kN/m | Width at 70 kN/m |
|---|---|---|
| Rock (type I) | equal to the wall width | equal to the wall width |
| Medium gravel/sand, stiff clay (II/III) | 250 mm | 650 mm |
| Firm clay, sandy clay (IV) | 300 mm | 850 mm |
| Loose sand (V) | 400 mm | 600 mm (30 kN/m cap)* |
| Soft silt/clay (VI) | 450 mm | 650 mm (30 kN/m cap)* |
* Loose sand and soft silt/clay only work off the table up to 30 kN/m of wall load — above that the footing has to be designed by an engineer. Very soft ground (where a finger pushes in easily) isn’t in the table at all — Table 10 sends you to specialist advice. Read your exact width straight off Table 10 for your ground and load; the numbers above are just the ends of the range.
Thickness. The concrete strip itself has a minimum thickness T of 150 mm, or the projection P (how far it sticks out past the wall face), whichever is greater — para 2E2c. Filling the whole trench with concrete (trench fill) is an accepted alternative to a thin strip.
Work it out on site
The depth and width come off the code and the plan. The volume of concrete you order is just maths — and it feeds straight into the calculator. Say you’ve got a strip footing to pour. These are example numbers, not code minimums — your real sizes come off Table 10 and your plan:
- Total length of trench: 22 m
- Footing width: 0.45 m
- Footing depth (trench fill): 0.6 m
Volume = length × width × depth:
22 × 0.45 × 0.6 = 5.94 m³
So you’d order about 5.9 cubic metres, then add a bit for spillage and an uneven trench bottom — most bricklayers tack on 5 to 10 per cent. Swap in your own sizes and the calculator does the sum for you.
Do it in 5 seconds
Related
- Part of the UK building codes hub — the pillar guide, with England, Wales, Scotland and Northern Ireland kept separate.
- Setting out the stairs in the same build? See UK stair and barrier requirements.
Sources
- The Building Regulations 2010, Schedule 1 Requirement A1 (Loading), satisfied via Approved Document A (Structure), 2013 edition — Section 2E “Foundations of plain concrete”, paras 2E1–2E4 and Table 10 — the 450 mm frost depth (2E4), the 0.75/0.9/1.0 m shrinkable-clay depths (2E4), the 150 mm / projection thickness rule (2E2c) and the strip-footing widths (Table 10). Free to download at gov.uk.
- Adoption caveat. These figures are for England only. Approved Document A 2013 edition is still the current version in 2026 — no consolidated replacement has been issued. Wales has its own Approved Document A, and Scotland (Technical Handbooks) and Northern Ireland (Technical Booklet D) are separate regimes not covered here. Approved Documents are guidance, not the law itself — compliance can also be shown by other means, such as a full geotechnical design to BS EN 1997-1 (Eurocode 7) where the ground is variable or the loads exceed the table. Always confirm the current document and check your ground with a soils report or engineer before you dig.