Ordering gravel, crushed stone, or road base comes down to two numbers: volume (measured in cubic yards or cubic metres) and weight (measured in US short tons or metric tonnes). Quarries and aggregate yards almost always bill by the ton over the weighbridge, while builders measure the excavation on site in feet, inches, metres, and millimetres.
The Chippy Tools Gravel Calculator converts your length, width, and depth into exact cubic yards, cubic feet, or cubic metres—with a built-in 10% allowance for plate compaction and uneven sub-grades.
Quick Reference Table 1: Gravel Volume & Tonnage by Project Size
The table below gives cubic yards (yd³) and US tons (calculated at 1.45 tons/yd³ for standard crushed stone, plus a +10% compaction buffer) across common path, shed pad, and driveway sizes:
| Project / Area Size | Surface Area | 2" Deep (50 mm) Path / Topcoat | 4" Deep (100 mm) Slab Base | 6" Deep (150 mm) Driveway Base | Metric at 100 mm (m³ / Tonnes) |
|---|---|---|---|---|---|
| 4 × 20 ft (Walkway) | 80 ft² (7.4 m²) | 0.49 yd³ / 0.8 tons | 0.99 yd³ / 1.6 tons | 1.48 yd³ / 2.4 tons | 0.74 m³ / 1.3 t |
| 10 × 10 ft (Patio / Shed) | 100 ft² (9.3 m²) | 0.62 yd³ / 1.0 tons | 1.23 yd³ / 2.0 tons | 1.85 yd³ / 3.0 tons | 0.93 m³ / 1.6 t |
| 12 × 20 ft (1-Car Pad) | 240 ft² (22.3 m²) | 1.48 yd³ / 2.4 tons | 2.96 yd³ / 4.7 tons | 4.44 yd³ / 7.1 tons | 2.23 m³ / 3.9 t |
| 12 × 50 ft (Single Drive) | 600 ft² (55.7 m²) | 3.70 yd³ / 5.9 tons | 7.41 yd³ / 11.8 tons | 11.11 yd³ / 17.7 tons | 5.57 m³ / 9.8 t |
| 20 × 20 ft (2-Car Pad) | 400 ft² (37.2 m²) | 2.47 yd³ / 3.9 tons | 4.94 yd³ / 7.9 tons | 7.41 yd³ / 11.8 tons | 3.72 m³ / 6.5 t |
| 20 × 40 ft (2-Car Drive) | 800 ft² (74.3 m²) | 4.94 yd³ / 7.9 tons | 9.88 yd³ / 15.8 tons | 14.81 yd³ / 23.6 tons | 7.43 m³ / 13.0 t |
| 20 × 60 ft (Long Drive) | 1,200 ft² (111.5 m²) | 7.41 yd³ / 11.8 tons | 14.81 yd³ / 23.6 tons | 22.22 yd³ / 35.4 tons | 11.15 m³ / 19.5 t |
(Tonnage columns above include a 10% allowance for compaction and sub-base low spots.)
Quick Reference Table 2: Density & Weight by Aggregate Type
Different aggregates lock together differently. Open-graded washed stone has air voids between rocks, while road base (crusher run) contains stone dust (“fines”) that packs into a solid, heavy mat:
| Aggregate / Gravel Type | Typical Stone Size | Weight per Cubic Yard (lb/yd³) | US Tons per yd³ | Metric Tonnes per m³ | Best Construction Use Case |
|---|---|---|---|---|---|
| Pea Gravel (Washed Round) | 1/4" – 3/8" (6–10 mm) | 2,700 – 2,850 lb | 1.35 – 1.42 tons | 1.60 – 1.70 t/m³ | Footpaths, pipe bedding, play areas, French drains |
| #57 Crushed Stone / Blue Metal | 3/4" – 1" (20 mm) | 2,700 – 3,000 lb | 1.35 – 1.50 tons | 1.60 – 1.78 t/m³ | Driveway wearing course, drainage trenches, concrete mix |
| River Rock / Cobbles | 1" – 3" (25–75 mm) | 2,600 – 2,900 lb | 1.30 – 1.45 tons | 1.54 – 1.72 t/m³ | Swales, dry creek beds, garden borders |
| #3 / #4 Coarse Ballast | 1.5" – 2.5" (40–65 mm) | 2,600 – 2,850 lb | 1.30 – 1.42 tons | 1.54 – 1.70 t/m³ | Bottom structural sub-base layer for heavy driveways |
| Crusher Run / Road Base (DGB20) | 3/4" minus with fines | 3,100 – 3,400 lb | 1.55 – 1.70 tons | 1.84 – 2.02 t/m³ | Compacted sub-base under slabs, pavers, and asphalt |
| Decomposed Granite (DG) | 3/8" minus with fines | 3,000 – 3,300 lb | 1.50 – 1.65 tons | 1.78 – 1.96 t/m³ | Compacted pathways, courtyard surfaces, patios |
How to Calculate Gravel Volume & Tonnage by Hand
1. Imperial Formula (Feet, Inches, Cubic Yards & US Tons)
- Convert depth in inches to feet:
Depth (ft) = Depth (in) ÷ 12 - Find volume in cubic yards:
Cubic Yards (yd³) = [Length (ft) × Width (ft) × Depth (ft)] ÷ 27
- Convert cubic yards to US tons:
US Tons = Cubic Yards × Tons per yd³ (use 1.40 for clean stone; 1.65 for road base)
- Add 10% for compaction: Multiply by
1.10(plate-compacting road base compresses loose depth by 10% to 15%).
2. Metric Formula (Metres, Millimetres, Cubic Metres & Tonnes)
- Convert depth in millimetres to metres:
Depth (m) = Depth (mm) ÷ 1,000 - Find volume in cubic metres:
Cubic Metres (m³) = Length (m) × Width (m) × Depth (m)
- Convert to metric tonnes:
Tonnes (t) = Cubic Metres × Density (1.60 t/m³ for drainage gravel; 1.90 t/m³ for road base)
Worked Examples
Example 1: Two-Layer Gravel Driveway (12 ft × 60 ft)
Suppose you are building a 12 ft × 60 ft (720 sq ft) gravel driveway with a 4-inch compacted crusher-run base and a 2-inch #57 crushed stone topcoat:
- Base layer (4 in = 0.333 ft of crusher run):
- Net volume =
720 × 0.333 ÷ 27= 8.89 yd³ - With +10% compaction buffer = 9.78 yd³ × 1.65 tons/yd³ = 16.1 tons of crusher run.
- Net volume =
- Top wearing layer (2 in = 0.167 ft of #57 stone):
- Net volume =
720 × 0.167 ÷ 27= 4.44 yd³ - With +10% buffer = 4.89 yd³ × 1.42 tons/yd³ = 6.9 tons of #57 crushed stone.
- Net volume =
Example 2: Compacted Road Base Under a 6 m × 4 m Shed Slab (100 mm Deep)
- Net volume:
6 m × 4 m × 0.10 m= 2.40 m³ - With 10% compaction allowance:
2.40 × 1.10= 2.64 m³ - Tonnage (at 1.9 t/m³ for 20 mm road base):
2.64 × 1.9= 5.02 tonnes.
Related Calculators & Guides
- Concrete Calculator: Pouring a slab over your compacted gravel sub-base? Calculate the exact concrete volume and bag count.
- Asphalt Calculator: Paving hot-mix asphalt over your road-base layer? Estimate compacted asphalt tonnage.
- Soil Calculator: Calculate topsoil, garden mix, and excavation fill volumes.
- Gravel and Base Volume Calculation Guide: Detailed sub-base compaction and lift-thickness guide.
- How Much Does a Cubic Yard Weigh?: Compare dry vs. wet aggregate weights and truck payload limits.